Japanese semiconductor manufacturer

  • Vị trí

DESCRIPTION

- Semiconductor factory image
- Customer request 
・ High cleanliness 
・ Construction in a short period of time 
- Construction details: Insulation panel for clean room 
- Panel area: Approximately 38,000㎡ 
- Construction completed: March 2020

Semiconductor clean room with less on-site processing and less cleaning after construction

️ Construction points Embed an outlet box inside the insulation panel to prevent dust accumulation. Construction is carried out under strict control so that there is no air leak. In order to reduce the work of cutting the insulation panel at the site, the design was drawn up by a preliminary meeting, and short-term construction was realized by closely coordinating with the site.